17.
Complete the bridge unit attachment. Refer to the procedure for connecting the optional
unit downstream of the bridge unit.
• Booklet Finisher SR3240 (D3BB) (page 234)
• Finisher SR3230 (D3BA) (page 234)
• Booklet Finisher SR3220 (D3B9) (page 260)
• Finisher SR3210 (D3B8) (page 269)
18.
After the finisher is installed, turn ON the main power.
19.
Check that the finisher can be selected at the operation panel.
Bridge Unit BU3070 (D685)
233