Yamaha F150A Service Manual page 79

Outboard engine
Hide thumbs Also See for F150A:
Table of Contents

Advertisement

2
5. Install the shift cable "1" to the shift cable
holder "2" and fasten it using the holder
"3".
1
1
2
6. Align the mark "a" on the bushing "1" with
the mark "b" on the plate "2".
1
7. Adjust the shift cable joint "1", and then
install the shift cable joint "1" to the pin
"2".
The shift cable joint must be screwed in
8.0 mm (0.31 in) or more "a".
1
2
3
a
2
b
TIP:
When it is not possible to ensure cable
screw-in length of 8.0 mm (0.31 in) or more,
remove the shift cable holder "3", and then
reinstall it to the hole "b" or "c" to adjust the
length.
2
3
c
Dimension "a": 8.0 mm (0.31 in) or more
8. Install the clip "1", and then tighten the
shift cable locknut "2" to the specified
torque.
1
Shift cable locknut "2":
5 N·m (0.5 kgf·m, 3.7 ft·lb)
9. Check the shift cable for proper opera-
tion.
3-10
Rigging grommet mounting
1
a
b
0
1
1
2
3
4
5
6
7
8
2
9
10
A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl150aF150bFl150b

Table of Contents