Installing The Gear Pump Assembly - Yamaha F150A Service Manual

Outboard engine
Hide thumbs Also See for F150A:
Table of Contents

Advertisement

2
1
Plug "2": 4 N·m (0.4 kgf·m,, 3.0 ft·lb)
8. Install the spacers "1" and "2", the port
plugs "3", and new O-rings "4" and "5".
5
4
4
2
3
1

Installing the gear pump assembly

Lubricate the parts using ATF Dexron II dur-
ing assembly.
When assembling the PTT unit, do not use
a rag. Otherwise, dust and particles could
get on the PTT unit components, causing
poor performance.
1. Install the gear pump assembly "1", pro-
tection valves "2" and "3", wave washer
"4", backup ring "5", filter "6", and plate
"7", and then tighten the gear pump bolt
"8" to the specified torque.
8
6
5
1
Gear pump bolt "8":
7 N·m (0.7 kgf·m, 5.2 ft·lb)
9-61
PTT gear pump
8
7
3
2
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fl150aF150bFl150b

Table of Contents