Select a location for mounting the Controller, meeting the following recommendations:
1 .
Mount at least ten (10) feet from open water .
2 .
Mount close enough for the supplied power cord to reach the supply voltage . The Controller will not operate
properly without a solid earth ground connection .
Proper and safe operation requires an earth ground connection.
3 .
Supply power must be routed to the Controller in accordance with the applicable codes in the area; the
supplied power cord is not code in some areas .
4 .
The installation surface must be solid and vertical . Do not mount the Controller in a horizontal position .
Keep the Controller out of direct sunlight, inside a room if possible.
Direct sunlight on the Controller will result in inaccurate readings.
A shade screen should be used for outdoor installations.
5 .
Maintain adequate clearance for opening the front panel enclosure .
6.
The environment should be free of chemical fumes and excessive heat.
The maximum room temperature is should not exceed 110 ºF.
7 .
Mount as far as possible from sources of electrical interference .
8 .
Install the four mounting feet as desired to the Controller back and prepare the hole to the mounting
surface as desired .
9 .
Hold the Controller against the mounting surface with a closed lid and mark the location of the mounting
bracket located on the top of the Controller next to the wall. Prepare holes as necessary and secure
Controller using hardware provided .
10.
Mount on a flat surface. Controller box will distort if mounted on an uneven surface.
11 .
Pre-install screws with ¼ left out on bottom so that the Controller can slide into them . Install the remaining
side screws and tighten .

Mounting Instructions

WARNING
!
WARNING
!
ACU-TROL
®
AK110 Chemical Controller Installation and User's Guide
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents