Siemens SCALANCE XB-200 Web Based Management page 116

Industrial ethernet switches
Hide thumbs Also See for SCALANCE XB-200:
Table of Contents

Advertisement

Configuring with Web Based Management
5.4 The "System" menu
● OperState
Displays the current operational status. The operational status depends on the configured
"Status" and the "Link". The available options are as follows:
– Up
– Down
● Link
Shows the connection status to the network. The available options are as follows:
– Up
– Down
Changing the port configuration
Click the appropriate box to change the configuration.
Note
Optical ports only work with the full duplex mode and at maximum transmission rate. As a
result, the following settings cannot be made for optical ports:
• Automatic configuration
• Transmission speed
• Transmission technique
Note
With various automatic functions, the device prevents or reduces the effect on other ports
and priority classes (Class of Service) if a port is overloaded. This can mean that frames are
discarded even when flow control is enabled.
Port overload occurs when the device receives more frames than it can send, for example as
the result of different transmission speeds.
Steps in configuration
1. Change the settings according to your configuration.
2. Click the "Set Values" button.
116
You have configured the status "enabled" for the port and the port has a valid
connection to the network.
You have configured the status "disabled" or "Link down" for the port or the port has
no connection.
The port has a valid link to the network, a link integrity signal is being received.
The link is down, for example because the connected device is turned off.
SCALANCE XB-200 Web Based Management
Configuration Manual, 04/2015, C79000-G8976-C360-02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents