Perform Axle Maintenance - Ansi Models - Genie TMZ-50/30 Service Manual

Hide thumbs Also See for TMZ-50/30:
Table of Contents

Advertisement

Section 3 • Scheduled Maintenance Procedures
800-610-4101
ActionRental.com
CHECKLIST A PROCEDURES
A-5
Perform Axle Maintenance -
ANSI Models
Axle specifications require that this
procedure be performed, initially
and following a wheel change,
after the first 10, 25 and 50 miles.
Proper axle maintenance, following the axle
manufacturer's maintenance schedule, is essential
to good axle performance and service life. Failure
to perform the maintenance procedures can lead to
poor axle performance and component damage.
Required maintenance procedures and additional
axle information is available in the Dexter Axle
Operation Maintenance Service Manual
(Dexter part number LIT-001-00).
Dexter Axle Operation Maintenance Service Manual
Genie part number
3 - 8
A-6
Perform Axle Maintenance -
CE Models
Proper axle maintenance, following the axle
manufacturer's maintenance schedule, is essential
to good axle performance and service life. Failure
to perform the maintenance procedures can lead to
poor axle performance and component damage.
Required maintenance procedures and additional
axle information is available in the Knott Axle
Service Manual (Knott part number P005).
Knott Axle Service Manual
Genie part number
84376
TMZ-50/30
June 2005
Axle specifications require that this
procedure be performed initially
after the first 50 km, or 50 km after
a wheel change.
Part No. 65162
REV B
84443

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents