Pnc License Settings For S8700-Series Servers; Preinstallation Tasks To Complete At The Customer Site; Verifying That All The Required Equipment Is On Site; Ensuring That The Preinstallation Tasks Are Complete - Avaya S8700-Series Installing And Configuring

Hide thumbs Also See for S8700-Series:
Table of Contents

Advertisement

- Return to this document and see:
IP interface.
-
Installation verification
-
Server access
-
Installation troubleshooting

PNC license settings for S8700-series Servers

For Communication Manager Release 4.0 and later releases, the two major types of port
network connectivity, IP-PNC and fiber-PNC (also called multiconnect), are both automatically
enabled in all licenses for S8700-series Server. As a result, unlike the license settings in
previous releases, platform 8 for IP-PNC and the Internet Protocol (IP) PNC feature attribute
are no longer needed and are not available as license options. For Release 4.0 and later
releases, you always select platform 6, multiconnect, in a license for an S8700-series Server.

Preinstallation tasks to complete at the customer site

You must complete the following preinstallation tasks before you start the installation.
Install the DAL2 card, if used
l

Verifying that all the required equipment is on site

Compare the list of items that were ordered to the contents of the boxes to verify that you have
all the equipment. Your project manager can give you an inventory list. Do not rely on the
packing slips inside the boxes for the correct information.

Ensuring that the preinstallation tasks are complete

The preinstallation team completes the following tasks. If these tasks are not complete, do not
continue with the installation.
Verify that the required number of open, customer-supplied, EIA-310D (or equivalent)
l
standard 19-in. (48-cm) 4-post equipment rack(s) is(are) properly installed and solidly
secured. Ensure that the screws that come with the racks are present. If you use an
enclosed rack cabinet, ensure that the cabinet has adequate ventilation.
Preinstallation tasks to complete at the customer site
IP interface configuration
Postinstallation administration
on page 83
on page 95
on page 107 if problems occur during the installation.
on page 65 to program the
on page 73
Issue 8 May 2009
13

Advertisement

Table of Contents
loading

Table of Contents