Ngc-30 Windows - Detailed Descriptions; Setup Window - Pentair raychem ngc-30/uit2 Programming Manual

Table of Contents

Advertisement

Local/A
RTD
Local
RTD
Local
RTD
Local
RTD
Local
RTD
NGC-UIT
RS-485
B
C
D 3
3.3 nGC-30 WindoWs – detaiLed desCriPtions
industrial heat tracing solutions
The Raychem NGC-30 software can manage up to 260 Circuits similar to that depicted above.
The control Circuit concept is not limited to the simple arrangement shown above. Multiple input
circuits and "monitor only" circuits are possible as depicted on the following page.
Channel
LC
GF
Output
1
Relay 1
LC
GF
Output
2
Relay
LC
GF
Output
3
Relay
LC
GF
Output
4
Relay
LC
GF
Output
5
Relay
#1
2
4
Additional
5
RTDs
6
7
8
RMM2
Fig. 3.6 Multiple input control circuit

3.3.1 setuP WindoW

To input any device address, the modules must be connected and powered during startup of the
Raychem NGC-UIT2-EX program. The program scans for the device number(s) on the network
during the update network process. The Network|Devices window lists all the device address(es)
found. The addresses listed are the only device addresses that the program recognizes as valid.
If a device is added after the Raychem NGC-UIT2-EX program has scanned the network, go to the
Network window and select "Update Network."
Each device must have a unique device address number. For example, if the design requires both
a NGC-30-CRM and a RMM2 module, and 32 is chosen for device address number for the NGC-30-
CRM, then the RMM2 module cannot also use address 32. This also applies to the other modules.
(See Available Device Address Table on page 56 for device address restrictions).
EN-RaychemNGC30UIT2Programming-AR-H58186      02/16
NGC-30-CRM/-CRMS
Board
LC = Line current
GF = Ground fault
Output
DI 1
Relay 1
DI 2
Output
Relay
RO 1
RO 2
Output
RO ...
Relay
RMC
RTD 1
RTD 2
NGC-20
Lim RTD
DI 1
DI 2
...
DI 15
RMM-DI
28 / 84

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents