2.2 settinG uP additionaL CirCuits

2.3 CirCuits 1–4 setuP ComPLete ConFirmation
industrial heat tracing solutions
Fig. 2.18 Circuit 1 disabled
At the Main status display with Circuit #1 disabled:
• On the Main menu window, any Disabled Circuit is grayed out as above.
Follow Steps 4 through 10 above to set-up each additional Circuit.
After completing the Setup for Circuits 1, 2, 3, and 4, and Circuits are Enabled, go to the Main
window to confirm all Circuits are activated and working properly.