If the sources do not sync before the Fail to Sync time
delay expires, the programmed-transition override
function operates.
D
If the override function is set to Automatic, a
programmed-transition transfer will occur when the
Fail to Sync time delay expires. The contactor stops
in the OFF position for the length of the off-to standby
time delay before proceeding to transfer to the
standby source.
D
If the override function is set to manual, the user can
either initiate a programmed-transition type transfer
(setup password required) or cancel the test
sequence. See Figure 3-13. If neither action is taken,
the
controller
will
synchronization
and
synchronize.
See Section 5.14.2 for instructions to set the
programmed-transition override function.
Manual Transfer
Password:
Cancel
2
1. Use arrow buttons to enter the setup password and click OK
to initiate a manual programmed-transition transfer. OR
2. Press the Cancel button to cancel the test.
Figure 3-13
Manual Transfer Screen for
Programmed-Transition Override

3.10.4 Auto-Loaded System Test

The auto-loaded test feature is a timed, loaded test. The
auto-loaded time delay determines how long after the
transfer to standby to terminate the test and transfer
back to the preferred source. The time is defaulted to
30 minutes and can be adjusted from 1 minute to
60 minutes. See Figure 3-14.
Type of Test
Auto Loaded
Time :## min
B
"
Main
Start
3
1
1. Press right arrow button to go to the Enter Time menu.
2. Use the open arrow buttons to enter the duration time for the
test. Then press OK.
3. Press Start to start the test.
Figure 3-14
Auto Loaded Test Menus
TP-6714
4/10
continue
to
check
transfer
if
the
sources
1
OK
Auto Loaded Test
Enter Time
Time: ?? min
Back OK
2

3.10.5 Sync Check (closed-transition)

The Sync Check allows a test of the synchronization of
two available sources without initiating a transfer.
Navigate to the Type of Test, Sync Check menu and
press the Start button to begin the test. The controller
displays Syncing during the test, and the phase angle
difference is shown between two arrows. For example,
> 10 < indicates that the sources are 10 degrees out of
phase. The arrows move closer together as the sources
approach synchronization.
synchronize, the controller indicates Synced and
continues to monitor the source synchronization. The
load is not transferred. See Figure 3-15. Press the End
Test button to end the test.
for
Time-stamped readings of source phase angle
differential, frequency, and voltage during the test are
logged in a SyncDataLog.csv file. Data readings are
logged approximately once every second for one
minute. Simply insert a flash drive into the controller's
USB port during the sync check test to save the file. See
Section 6.4 for more information about data files.
Figure 3-15
Sync Check Screens
When the sources
Type of Test
Sync Check
B
Main
Start
System on Test
Norm ###V Emer ###V
Syncing
End
Main
>
102
< Test
System on Test
Norm ###V Emer ###V
Synced
End
Main
><
Test
Section 3 Operation
37

Advertisement

Table of Contents
loading

Table of Contents