Kohler MPAC 1500 Manual page 17

Hide thumbs Also See for MPAC 1500:
Table of Contents

Advertisement

LD Exer ##/## @ ##:##
Norm ###V Emer ###V
B
Time to Enter #:##
B
Main
B
Engine Start in ##:##
Norm ###V Emer ###V
System on Test
Norm ###V Emer ###V
Main
Figure 2-2
Starting and Stopping the Automatic Operation Test
TP-6714
4/10
System OK
On the main screen, press the Test button.
View
Set
Test
Use the open arrow buttons to enter the Test
Enter Password
password. See Section 3.4 for instructions. Then
> ? ? ? ? <
press the OK button.
OK
Type of Test
Press the down arrow button to step to the
Auto Load
Time :## min
loaded test screen.
"
Start
Type of Test
Press the Start button to initiate the test
Loaded
sequence.
Main
Start
Additional test sequence screens may appear,
depending on the system settings.
End
End
Delay Test
Press the Main button to return to the main screen
during the test, if desired. From the main screen,
press Test to return to the test screen.
End
Test
Press the End Test button to end the test.
Section 2 Operation Tests
17

Advertisement

Table of Contents
loading

Table of Contents