Install The Services Gateway Using A Lift - Juniper SRX5600 Getting Started Manual

Services gateway
Hide thumbs Also See for SRX5600:
Table of Contents

Advertisement

SRX5600 Services Gateway Getting Started Guide

Install the Services Gateway Using a Lift

10
To remove the components from the services gateway:
Slide each component out of the chassis evenly so that it does not become stuck or
1.
damaged.
Label each component as you remove it so you can reinstall it in the correct location.
2.
Immediately store each removed component in an electrostatic bag.
3.
Do not stack removed components. Lay each one on a flat surface.
4.
NOTE:
For complete instructions on removing services gateway components,
see "Install the Services Gateway Without a Mechanical Lift" in the SRX5600
Services Gateway Hardware Guide.
To install the services gateway using a lift:
Ensure that the rack is in its permanent location and is secured to the building. Ensure
1.
that the installation site allows adequate clearance for both airflow and maintenance.
For details, see the SRX5600 Services Gateway Hardware Documentation at
www.juniper.net/techpubs/
Load the services gateway onto the lift, making sure that it rests securely on the lift
2.
platform (see
Figure 6 on page
.
11).
Copyright © 2013, Juniper Networks, Inc.