To remove the components from the services gateway:
1. Slide each component out of the chassis evenly so that it does not become stuck or damaged.
2. Label each component as you remove it so you can reinstall it in the correct location.
3. Immediately store each removed component in an electrostatic bag.
4. Do not stack removed components. Lay each one on a flat surface.

Install the Services Gateway Using a Lift

To install the services gateway using a lift:
1. Ensure that the rack is in its permanent location and is secured to the building. Ensure that the installation
site allows adequate clearance for both airflow and maintenance. For details, see the SRX5400 Services
Gateway hardware documentation at www.juniper.net/documentation/.
2. Load the services gateway onto the lift, making sure that it rests securely on the lift platform (see
Figure 6 on page
12).