Step 4: Connect The Grounding Cable - Juniper SRX5600 Getting Started Manual

Services gateway
Hide thumbs Also See for SRX5600:
Table of Contents

Advertisement

Step 4: Connect the Grounding Cable

Copyright © 2013, Juniper Networks, Inc.
Slide each component into the chassis evenly so that it does not become stuck or
2.
damaged.
Tighten the captive screws or lock any levers for each component installed.
3.
NOTE:
Make sure that all empty slots are covered with blank panels before
you operate the services gateway.
Proceed to
"Step 4: Connect the Grounding Cable" on page
WARNING:
To meet safety and electromagnetic interference (EMI)
requirements and to ensure proper operation, you must properly ground the
services gateway chassis before connecting power.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect
1.
the strap to an approved site ESD grounding point. See the instructions for your site.
Connect the grounding cable to a proper earth ground.
2.
Verify that a licensed electrician has attached the cable lug provided with the services
3.
gateway to the grounding cable. The cable must be 6-AWG (13.3 mm
60°C wire.
Make sure that grounding surfaces are clean and brought to a bright finish before
4.
grounding connections are made.
Disconnect the ESD grounding strap from the site ESD grounding point, and connect
5.
it to one of the ESD points on the chassis. For more information about ESD, see the
SRX5600 Services Gateway Hardware Documentation at
Place the grounding cable lug over the grounding point. The grounding point is sized
6.
for UNC 1/4-20 screws and 1/4 in. split washers, which are provided in the accessory
box.
Secure the grounding cable lug to the grounding point, first with the washers, and then
7.
with the screws as shown in
Step 4: Connect the Grounding Cable
Figure 8 on page
14.
13.
2
), minimum
www.juniper.net/techpubs/
.
13

Advertisement

Table of Contents
loading

Table of Contents