16.2.7 Removing the Compressor and Heat Storage Tank
1
Perform "16.2.1 Removing the Outer Top Panel and Outer Front Panel".
2
Perform "16.2.2 Removing the Electrical Component Covers (2 & 3-way valve Cover and Terminal Plate
Cover)".
3
Perform "16.2.3 Removing the Power-Supply Box".
4
Perform "16.2.6 Removing the Outer Side Panel (Right)".
5
Remove the 4-way valve coil, expansion valve coil, defrosting 2-way valve coil and heat storage tank 2-way
valve coil. Then, remove the fixing screws of the acoustic insulation board (3 pieces on the right side and 1
piece at the front bottom).
Note on assembly: When attaching the defrosting 2-way valve coil and heat storage tank 2-way valve coil,
attach the coils according to the colors indicated on the metal sheet located below the coils to the main
unit.
6
Cut the band which fixes the heat storage tank to the acoustic insulation board. Remove the acoustic
insulation board.