[B]
Connection for developer bias adjustment
Front cover opening/closing switch
Ground to the
machine frame
( green cable )
( - ) terminal:
Connect with the white cable
[C] Connection for main charger adjustment
Front cover opening/closing switch
Ground to the
machine frame
( green cable )
( - ) terminal:
Connect with the white cable
e-STUDIO200L/202L/203L/230/232/233/280/282/283
ADJUSTMENT
Fig. 3-23
Fig. 3-24
© 2004 - 2007 TOSHIBA TEC CORPORATION All rights reserved
3 - 36
( + ) terminal:
Connect with the black cable
( + ) terminal:
Connect with the
red cable ( thick line )