Stylus Pro5000
4.3.2 Assembling Gear Train
Here explains procedure to assemble gear train. Since assembling gear
train require to have several phases between gears, it will be almost
impossible to assemble gear train without referring this section.
Therefore, in case of disassembling gear train, make sure to refer to this
section and assemble the gear train. Also, this procedure is written based on
the assumption that the final step(Step26) in the previous section;
Disassembly of Gear Train is completed.
1. Insert "Lever, Stopper, ASF" into axis, and also insert "Combination Gear,
30.30" into the same axis.
9
CHECK POINT
When installing "Combination Gear,30.30", be
careful of which is top. The bigger gear side is top.
2. Insert "Gear,12.8" into the axis.
9
CHECK POINT
In case of removing "Gear,12.8", since there is
phase(engagement) between the gears located on
the "Hopper Release Assembly" and "Gear,12.8",
refer to Figure4-86 and arrange phase between
these two gears. When moving "Hopper Release
Assembly" right and left manually, insert
"Gear,12.8" into the axis so that the big gear of
"Gear,12.8" can engage with the big gear on the
"Hopper Release Assembly".
Rev. A
"Lever Assembly, Hopper"
Figure 4-85. Installing "Combination Gear,30.30"
"Gear,12.8"
Figure 4-86. Installing "Gear,12.8"
"Combination Gear,30.30"
Be careful of which side comes
top.
"Frame Gear" on
the "Hopper Release
Lever Assembly"
Chapter4
4-46