Tools Required To Install The Srx5800 Services Gateway; Rack; Chapter 7 Installing The Srx5800 Services Gateway - Juniper SRX5800 Hardware Manual

Hide thumbs Also See for SRX5800:
Table of Contents

Advertisement

CHAPTER 7
Installing the SRX5800 Services Gateway

Tools Required to Install the SRX5800 Services Gateway

Related
Documentation
Removing Components from the SRX5800 Chassis Before Installing It in the Rack
Copyright © 2014, Juniper Networks, Inc.
Tools Required to Install the SRX5800 Services Gateway on page 69
Removing Components from the SRX5800 Chassis Before Installing It in the
Rack on page 69
Installing the SRX5800 Services Gateway Chassis in the Rack on page 76
Reinstalling Components in the SRX5800 Services Gateway Chassis After Installing
It in the Rack on page 79
To install the services gateway, you need the following tools:
Mechanical lift
Phillips (+) screwdrivers, number 2
Electrostatic discharge (ESD) grounding wrist strap
Overview of Installing the SRX5800 Services Gateway on page 47
Tools and Parts Required for SRX5800 Services Gateway Connections on page 87
Installing the SRX5800 Services Gateway Chassis in the Rack on page 76
Before installing the services gateway in the rack, you must first remove components
from the chassis to make it light enough to safely maneuver into the rack. With
components removed, the chassis weighs approximately 150 lb (68 kg). You reinstall
the components into the chassis after it is installed in the rack.
Removing the Power Supplies Before Installing the SRX5800 Services Gateway
1.
Chassis on page 70
Removing the Cable Manager Before Installing the SRX5800 Services Gateway
2.
Chassis on page 71
69

Advertisement

Table of Contents
loading

Table of Contents