1.3.5 Installation Clearance Data
≥1500
Unit:mm
1.3.6 Drain Piping Work
1) Installation of Drainage Pipeline
When connecting the drainage pipe with the unit, do not apply excessive force to the pipeline
at the side of the unit. The fixing position of the pipeline shall be near the unit.
Purchase general-purpose hard PVC pipe locally to be used as the drainage pipeline. When
Figure 1-3-2
A
B
950
890
950
890
Figure 1-3-6
Models
ASCU-12A
ASCU-18A
ASCU-24A
ASCU-36A
ASCU-42A
ASCU-48A
C
D
840
780
680
840
780
680
H(mm)
250
260
340
INSTALLATION
E
F
G
160
240
160
320
≥1500
68