Mountain Models SwitchBack Senior Assembly Instructions Manual page 11

Table of Contents

Advertisement

17. Install the 1/8" Lt Ply part as shown below. MAKE SURE that the holes for the landing gear
wires match up with the landing gear supports from step 16. If the holes don't line up, you will
NOT be able to install your landing gear. Now that would really be a pain, wouldn't it? After it
is glued into place, install the 1/8" Lt Ply bottom as shown below, ONCE AGAIN, making sure
that the holes for the landing gear wire line up.
18. Install the 1/16" balsa rear deck, as shown below. Make sure that it lines up with the front of
the 3/16" spine. The deck sits on top of the inside 1/8" longerons and inside of the 1/16" balsa
sides. You'll have to lightly bend the front of the 1/16" sheet to sit in the forward area.
19. Glue the MAGNETIC washers to the 1/8" Lt Ply canopy hold down plates, using the etched
circles for placement. Glue the canopy hold down plates in the fuselage as shown below.
11

Advertisement

Table of Contents
loading

Table of Contents