Step 2A, Install Hood Onto Wall - Monogram ZV48R Installation Instructions Manual

Table of Contents

Advertisement

Installation
Instructions
ISTEP 2A I INSTALL HOOD ONTO WALL
SKIPTHIS STEPIF INSTALLING BENEATHA SOFFITOR CABINET,
GO TO STEP2B.
Locate at least 2 vertical studsat the wood support.
Centerthe suppliedwood support, left to right and belowthe
20" marked line.
Bottom
of__
Hood
IMPORTANT: Framing
must be capable
of
supporting
up to 150 Ibs.
Install Transition
Onto Top of Hood
I
IMPORTANT:Remove
•-,,
- ....
shipping tape from
damper and check that
damper moves freely.
3
Wood
i!
Support
ii
i,
ii
i,
f,
\ Centerlineof
[_______I
Installation
Space J
,i
Securethe wood support to 2 or more vertical studs,using at
least 2 of the/4 suppliedlong screws.
IMPORTANT: Screwsmust penetrate at least 1-1/2" into vertical
studs.Countersinkscrewsinto support.
Note: The mounting
screws must remain in
their original shipping
location. These screws
are positioned to
engage the keghole
slots in the back of
]
i
i
i
i
i
the hood.
-
i
-i
/'
OriginalMounting
ScrewsasShipped
Adjust depth of original mounting screwsin the wood support
until theg protrude 1//4"forward. This 1//4"gap will provide
clearanceto hang the hood.
Duct
Transition
Placethe duct transition piece overthe hood exhaust and secure
with/4 screws provided.
Useduct tape to sealthe connection. Checkto be surethe
damper movesfreely.
Hung Hood On Wood Support
Lift the hood and hold closeto the installation location.Route
housewiring through the knockout and into thejunction box.
Placethe hood overthe wood support. Be surethe mounting
screwsengage the kegholeslotsin the back of the hood.Tighten
the screws.
WARNING:
Continueto provideadditional support
while the hood is mounted with onlg these 2 screws.Thesescrews
will not support the weight of the hood.Thehood couldfall
resulting in damage or personalinjurg.
_V _" I_II_
C m I_I_I| - Continuez
(_ f ournir
unsoutien
additionnel pendantlemontage dela hotteaveccesdeuxvisseulement,
Ces deuxvisnesoutiendront pasle poidsdela hotte.Lohottepeuttomber,
occasionnant desblessures corporelles o udesdommages m at@riels.
• Checkto be surethe hood is leveland centered.
Bottom
Mounting
Holes
30"
to
36"
Test Duct Cover Fit
Centerlineof
Installation
Space
Placeduct cover(s)overthe top of the hood to checkfor gaps.
Adjust the hood up or down if necessary.
Install Bottom Mounting Screws
Drill 1/8" pilot holesinto the two lower mounting holes.Enlarge
the holesif theg did not enter studsto 3/8".insert anchors
for wall fasteners into bottom holes.Removeanchor screws
and add flat washersprovided.Drive screwsinto anchors and
tighten.
install/4 additional screwsthrough the back of the hood and
into the wood support.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ZV48R and is the answer not in the manual?

This manual is also suitable for:

Zv36rZv30r

Table of Contents