General Overview - Audio Note Mono Block 300b/2A3 Instruction Manual

Table of Contents

Advertisement

In each kit bag is a parts list that you can check over – let us know if any parts are missing.

General Overview

The general order of the build is as follows:
Install all the transformers on the kit (we will call this the mechanical section).
The IEC section where we hook up the IEC inlet and rocker switch.
Build the hard-wired power supply followed the filament board.
Fit and wire the front insert plate where we will do most of the work out side the chassis.
Install the front insert plate in the chassis and complete all of the final inter-wiring and checks.
Take your time on the kit build – savor the build experience and do not be in too much of a hurry to turn on your kit!
Feel free to contact us for any questions or even moral support! Best of luck
Regards
Brian Smith and Audio Note Engineering
Copyright © 2007, 2008 AudioNote Kits
www.AudioNoteKits.com
audionotekits@rogers.com
Page 4

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Mono Block 300b/2A3 and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF