Function Board Connections - Nilfisk-ALTO SC100 Service Manual

Table of Contents

Advertisement

Service Manual – SC100 - Scrubtec 130
Electrical System
12

Function Board Connections

• (A) Power supply connection (blue cable)
• (B) Split power supply connection (brown cable) - Main motor (black cable).
• (C) Main motor connection (black cable)
• (D) Dosing pump connection (4-way connector - 2 cables).
• (E) Switch panel connection (12-way connector - 9 cables).
• (F) Solution level connection (3-way connector - 2 cables).
• (G) Parking position microswitch connection (3-way connector - 2 cables).
D
C
B
A
G
F
E

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scrubtec 130

Table of Contents