1.0 Installation of your Morsø stove
Installation of woodburning stoves must be safe and legal.
If your Morsø stove is not installed correctly, it may cause a house fire. To reduce
the risk of fire, the installation instructions must be followed carefully. Contact the
local building officials about restrictions and installation inspection in your area.
Before you start installing your stove, make sure that:
- The stove and chimney connection are placed far enough from combustible materials to meet
all clearance requirements.
- The floor protection must be adequate and must be made correctly according to ´the
requirements.
All neccessary approvals are needed from the local building officials.
The data plate, which is located on the back of the stove, provides information regarding safety
testing information, name of certified testing laboratory, and installation requirements.
Installation requirements vary in different districts, and the local building officials have the final
authorization to approve your installation. You should discuss the installation with them before
beginning. Please ask your dealer for further information.
Do not connect to any air distribution duct or system
Important: If the installation instructions are not followed carefully, it may cause dan-
gerous situations like chimney - and house fires. Follow the instructions carefully and
do not deviate from them as it may cause injuries to people or property.
1.1 Unpacking the stove
2B Standard: After removing the outer pack-
aging, flatten it and lay onto the floor close to
the stove; this can then act as protective work
surface during the assembly process.
Next, remove the legs and bolts from inside the
stove. Gently lay the stove onto its back and
unscrew it from the wooden pallet. Using the
bolts supplied, now screw the legs into position
on the underside of the base. The stove should
now be lifted and moved into the upright po-
sition, avoiding excess load on the back legs.
1.2 Checking loose parts in the stove
After unpacking, check that the fire bricks are
firmly in position and have not shifted in transit.
Check also that the air control works freely.
Before starting the initial fire, make sure that the
baffle (1) and insulation (2) over the baffle are
placed correctly, as shown on the images below.
4 5
B
Dim. without indication of margin acc. to DS/ISO 2768-1 m
Material:
Weight:
Model no.
.
1
2
B-B
Rev.
Revisions
Title:
Snit
2B Standard radiant NA
Morsø 2B Standard
Sign.:
Date:
Construction:
RSV
15.12.2009
Released:
A4
Format:
1:5
Scale:
Itemno.: