Main Dimensions - REMEHA P 520-13 Technical Instructions

Fuel oil/gas boilers
Hide thumbs Also See for P 520-13:
Table of Contents

Advertisement

2 Main dimensions

P 520
Minimum height for sweeping = 850
Flowrate detector
Boiler P 520
A (mm)
B (mm)
C (mm)
D (mm)
Ø E (weld) (mm)
Ø F (mm)
G (mm)
H (mm)
K** (mm)
L (mm)
M (mm)
P (mm)
K
R (mm)
K
S (mm)
K
T (mm)
U (mm)
*
Plain plate, requires cutting. Maximum cut-out 500 x 700.
**
Dimension representing the end of the 100 mm long chimney
connection.
G = Length required for clearing the water distributing tube.
Nota : with models P 520-21, P 520-23 and P 520-25, a plain plate
which must be cut out is supplied without the 100 mm chimney
connection.
6
P 520-13
P 520-15
P 520-17
1563
1785
2007
1522
1744
1966
1488
1488
1488
256
188
210
139.7
139.7
139.7
350
400
400
-
150
370
37
-31
-9
49
-19
3
1955
2245
2445
275
324
321
355
355
355
175
175
175
1760
1760
1760
1372
1594
1816
2021.5
2243.5
2465.5
Remeha P 520
Burner centre line
P 520-19
P 520-21
2229
2491
2188
2450
1504
1504
257
209
159
159
400
*
370
650
13
-35
25
-23
2645
2955
299
324
355
355
175
175
1760
1760
2038
2300
2687.5
2949.5
P 520-23
P 520-25
2713
2935
2672
2894
1504
1504
231
253
159
159
*
*
980
980
-13
9
-1
21
3155
3355
324
303
355
355
175
175
1760
1760
2522
2744
3171.5
3393.5
29/08/05 - 300003791-001-B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 520-15P 520-17P 520-19P 520-21P 520-23P 520-25

Table of Contents