Fuel-Oil Or Gas Connections; Electrical Connections; Maintenance; Sweeping - REMEHA P 520-13 Technical Instructions

Fuel oil/gas boilers
Hide thumbs Also See for P 520-13:
Table of Contents

Advertisement

Fuel-oil or gas connections

Refer to the instructions supplied with the burner.

Electrical connections

Refer to the connection instructions supplied with the control panel..

Maintenance

The operations described below shall only be performed
with the boiler and power supply off.

1 Sweeping

The boiler will only operate efficiently if the exchange surfaces
are kept clean.
The boiler should be cleaned as soon as required and as the
chimney, at least once a year or more, depending upon applicable
regulations and specific needs.
- Unfasten the wing nuts and remove the 4 sweeping doors.
- Cut the power supply to the boiler.
- Remove the upper front panel.
- Remove the retaining upper front crosspiece and then the lower
left and right-hand front panels.
- Remove the lower front panel.
*
14
Remeha P 520
29/08/05 - 300003791-001-B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

P 520-15P 520-17P 520-19P 520-21P 520-23P 520-25

Table of Contents