Danfoss TLX Installation Manual page 16

Solar inverters 3-phase- 6k/8k/10k/12.5k/15k
Table of Contents

Advertisement

Installation
1
Inverter
12A
12A
12A
12A
12A
12A
1
12A
12A
12A
12A
12A
12A
12A
12A
12A
12A
12A
12A
Illustration 2.21 Incorrect Parallel Connection
1
Parallel jumper
2
Parallel connection, 1 input. Current in first input is
exceeded, thus overloading cable and PV load switch.
3
Parallel connection missing. All PV power feeds into one
input, thus risking overload of PV connector, cable and PV
load switch.
4
Parallel jumper missing, thus risking overload of PV
connector, cable and PV load switch in the event of inverter
failure.
Table 2.3 Legend to Illustration 2.21
Cabling
2
20A
20A
20A
3
20A
20A
30A
20A
4
20A
20A
30A
20A
L00410309-09_02
PV module
7A
7A
7A
7A
2
2
13

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TLX and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Tlx pro

Table of Contents

Save PDF