Removing The Inverter; Opening And Closing The Inverter - Danfoss TLX Installation Manual

Solar inverters 3-phase- 6k/8k/10k/12.5k/15k
Table of Contents

Advertisement

Installation
mounting bracket (5). Check that it is not possible to lift
the bottom of the inverter away from the mounting
bracket. (6) Fasten the screws on either side of the wall
plate to secure the inverter.

2.3 Removing the Inverter

Loosen the locking screws on either side of the inverter.
Removal is performed in the reverse order of mounting.
With a firm grip at the lower end of the inverter, lift the
inverter approximately 20 mm vertically. Pull the inverter
slightly away from the wall. Push upwards at an angle until
the wall plate releases the inverter. Lift the inverter away
from the wall plate.

2.4 Opening and Closing the Inverter

WARNING
Remember to observe all ESD safety regulations. Any
electrostatic charge must be discharged by touching the
earthed housing before handling any electronic
component.
Illustration 2.14 Loosen Front Screws
Use a TX 30 screwdriver to loosen the two front screws.
Turn the screwdriver until the screws pop up. Screws are
secured with a spring and cannot fall out.
Illustration 2.15 Open the Inverter
Push the front cover upwards. When a slight resistance is
felt, give the front cover a tap on the bottom to snap it
into holding position. It is recommended to use the
holding position instead of dismounting the front cover
completely.
L00410309-09_02
2
2
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlx pro

Table of Contents