Step One; Step Two; Step Three - Teeter Power VI Assembly Instructions Instructional Training Manual

Inversion talbe with gravity lock
Table of Contents

Advertisement

ASSEMBLY
Note: The Bed Frame Assembly arrives rotated into the fully inverted position. This is the most convenient
position from which to begin the assembly process.

STEP ONE

Secure the Bed Frame Assembly (P12001) to the Frame Base
(P12002)
• Place the Frame Base flat on the floor, with the holes up.
The holes in the Frame Base are off-center, positioned
toward the front. (See Figure 1)
• Place the Bed Frame Assembly upright on its legs on top of
the Frame Base, with the smaller, angled legs pointing in the
same direction as the front of the Frame Base.
• Align the six (6) holes and insert a bolt with flat washer through
each hole on both sides of the Base. Loosely tighten the bolts
until certain that all of the holes are aligned properly, then
securely tighten with wrenches.
Figure 2

STEP THREE

Secure the Handles (P12003) to the Bed Frame Assembly
(P12001)
• Screw the Handles into the arms on both sides of the Bed
Frame Assembly.
TM
Power VI
Assembly Instructions
ASSEMBLY INSTRUCTIONS

STEP TWO

Secure the Main Shaft with Gravity Lock (P19521) to the Bed
Frame Assembly (P12001)
• Remove the Locking Knobs from the holes in the Main Shaft
with Gravity Lock (they are pre-assembled only for shipping
purposes).
• Insert the Main Shaft with Gravity Lock into the Bed Frame
Assembly. (See Figure 2) Line up the holes on the back of the
Bed with those in the Main Shaft with Gravity Lock.
• Insert the Locking Knobs and tighten to secure the Main Shaft
with Gravity Lock to the Bed Frame Assembly.
front
#LP-9526
Figure 1
rear
Figure 3
Pg. 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power VI and is the answer not in the manual?

Table of Contents