Pre-Operation Checks; Engine Cover Removal/Installation - TOHATSU BFT 250A Owner's Manual

Hide thumbs Also See for BFT 250A:
Table of Contents

Advertisement

BFT250A is 4-stroke, water cooled
outboard motor which uses unleaded
regular gasoline for fuel. It also
requires the engine oil. Check the
following before operating the
outboard motor.
Perform the following 
pre-operation checks with the
engine stopped.
Before each use, look around and
underneath the engine for signs of oil
or gasoline leaks.

Engine Cover Removal/Installation

<Removal>
ENGINE COVER LATCH
1. Pull the engine cover latch.
2. Remove the engine cover by taking
it up.

6. PRE-OPERATION CHECKS

<Installation>
COVER SIDE
1. Place the engine cover on the main
body.
2. Slide the engine cover so that the
cover lock on the cover is mated
with the lock in the main body.
COVER LOCKS
MAIN BODY SIDE
39

Advertisement

Table of Contents
loading

Table of Contents