9. Operator installation
To simplify the installation process, it is recommended that the existing gate is removed
from the pillar before proceeding.
Foundation box installation
As the foundation box is liable to fill with
water during rainfall, it is critical that an
adequate drainage system is prepared.
Refer to step 9.
1. Determine the correct position for the foundation box, i.e. standard or inside.
Standard mounting configurations
Inside mounting configurations
FIGURE 5. STANDARD MOUNTING CONFIGURATIONS
FIGURE 6. INSIDE MOUNTING CONFIGURATIONS
page 15