Consider total wattage requirements (lights, motors,
appliances) when selecting a generator set or when
sizing wattage usage in which available space and
construction limit the size of the generator set.
Motors
When figuring generator set capacity requirements for
loads that include electric motors, consider the high
current demanded by the motors during startup. The
inrush or starting current is typically 2--3 times higher
than that required when the motor reaches normal
operating speed. Allow reserve for inrush demands plus
other loads which could be on the line as the electric
motor starts. Use Figure 1 as a guide when selecting
generator set capacity requirements involving motor
loads.
Motor
Starting (Inrush)
HP
1/4
1/3
1/2
3/4
1
2
3
Figure 1 Motor Requirements
Lighting
To calculate lighting load, add the wattage of each
generator set-operated lamp. Note that not all of the
lights or lamps are on the generator set AC circuit; some
Voltage
Full load amps
Rated load amps
Locked rotor amps
Starting (inrush) watts
Running watts
Figure 2 Typical Marine Air Conditioner Requirements, 60 Hz
TP-6773 5/12a
Running
Watts
Watts
750
330
1000
400
1500
600
2000
750
3300
1100
4000
2000
5000
3000
Air Conditioner Size (Btu/Hr.)
7,000
115
230
9.3
4.8
7.7
4.0
34.0
20.0
3910
4600
886
920
are DC powered by a 12-volt battery. Make sure the
calculated total wattage includes only lights actually on
the generator set AC circuit.
Air Conditioners
The starting characteristics of air conditioners vary
greatly; one 12,000 Btu unit has, for example, lower
starting requirements than a 10,000 Btu unit of another
variety. When using only one unit, there is usually no
starting problem, provided the lighting and appliance
load is not too high when starting the unit.
Simultaneous starting of two air conditioning units,
however, can present problems if the generator set
capacity is marginal. Because of the variation in starting
characteristics among air conditioners, this publication
makes no statements regarding multiple-motor starting
capabilities of the generator set covered. Consider
delayed starting or use of easy-starting devices on air
conditioner units whenever simultaneously starting
more than one motor.
See Figure 2 for typical air conditioner requirements.
Information will vary with manufacturer.
Appliances
Generator sets often furnish AC for appliances such as
TV, stereo, electric water heater, etc. With the exception
of the resistance-type loads such as the water heater,
requirements for appliances are usually low. Do not
overlook such loads when figuring total requirements.
Allow reserve capacity for anticipated appliance loads to
avoid overloading a generator set.
9,000
12,000
115
230
115
9.9
5.0
11.8
7.0
3.5
8.9
40.0
20.0
50.0
4600
4600
5750
805
805
1020
16,000
230
115
230
6.3
16.3
8.0
4.8
13.0
6.2
31.0
75.0
36.0
7130
8630
8280
1100
1500
1430
24,000
230
11.6
10.2
56.0
12,900
2350
Appendix
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5efkod7-9efkozd9-11ekozd

Table of Contents