Installation Standard work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this
installation manual.
Customer:
Lot/Address:
Model (circle one): TIARAP-BK-IPI
WARNING! Risk of Fire or Explosion! Failure to install appliance according to these instructions can
lead to a re or explosion.
Appliance Install
Veri ed combustible or non-combustible clearances to walls. (Pg. 8)
Stove is installed level. (Pg. 26)
Venting/Chimney Section 7 (Pg 27-34)
Venting con guration complies with allowable vent requirements.
Venting installed, locked and secured in place with proper clearance.
Interior/Exterior restops installed and sealed.
Attic insulation shield installed.
Exterior wall/Roof ashing installed and sealed.
Terminations/Roof ashing installed and sealed.
Electrical Section 8 (Pg 35-39)
Unswitched power (110-120 VAC) provided for the appliance.
Switch wires properly installed.
Gas Section 9 (Pg 40-41)
Appliance con guration matches fuel type.
Was a conversion performed?
Leak check performed and inlet/outlet pressure veri ed.
Set air shutter for optimal ame appearance.
Appliance Setup Section 10 (Pg 42-44)
All packaging and protective materials are from removed inside/under/on
the appliance).
Logs and embers installed correctly.
Glass assembly installed and secured.
Accessories installed properly.
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation.
Started appliance and veri ed no gas leaks exist.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed _____________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments Communicated to party responsible ____________________ by ______________________on ___________
= Contains updated information.
3
Heat & Glo • TIARAP-BK-IPI, TIARAP-BR-IPI, TIARAP-CES-IPI Installation Manual • 2344-980_R4 • 11/14
ATTENTION INSTALLER:
Follow this Standard Work Checklist
TIARAP-BR-IPI
TIARAP-CES-IPI
(Builder / Gen. Contractor/) (Installer)
Date Installed:
Location of Stove:
Installer:
Dealer/Distributor Phone #
Serial #:
YES
IF NO, WHY?
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
(Date)
2344-982 5/14