Figure 4-1 Location Of Key Switch On Bottom Front Panel; Table; Fru Description Part Number Quantity; Power Cord For 72-In. (185 Cm) Sun Storedge Expansion 595-4881 - Sun Microsystems StorEdge 3900 Installation Manual

Series 2.0
Hide thumbs Also See for StorEdge 3900:
Table of Contents

Advertisement

The FRUs in

TABLE 4-1

FRU Description
Power cord for 72-in. (185 cm) Sun StorEdge Expansion

Cabinet (US), L6-30P

Power cord for 72-in. (185 cm) StorEdge Expansion
Cabinet (International), IEC 309
78.74-in. (2-meter) ground strap (in the kit shipped with
the storage system)
The following tools are required to perform the tasks in this chapter:
Keys for key switch (in the kit shipped with the storage system)
Slotted screwdriver, 1/4 inch
Voltmeter
4.1

Preparing the Storage System for Power

1. Verify that the key switch located at the bottom front of the system is in the
Standby position (
Keys for this switch are packed in the kit that was shipped with your system. If the
key switch is not in the Standby position, insert the key and turn the key switch to
standby.
Key switch
FIGURE 4-1
4-2
Sun StorEdge 3900 and 6900 Series 2.0 Installation Guide • March 2003
are required to perform the tasks in this chapter:
TABLE 4-1
Power Cord—FRU List
).
FIGURE 4-1
Front trim panel
Location of Key Switch on Bottom Front Panel
Part Number
Quantity
595-4881
2
595-4882
2
530-1619-01
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storedge 6900

Table of Contents