Installation Of Fire; Unpacking The Fire; Installing The Fire Box - Flavel Caress traditional Installation, Maintenance & User Instructions

Table of Contents

Advertisement

2.1

UNPACKING THE FIRE

Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List
1 off
Fire box / burner assembly
1 off
Boxed ceramic base, front ceramic rail and 20 coals (18 large, 2 small)
1 off
Trim
1 off
Fender and ashpan cover (boxed)
1 off
Restrictor baffle (all models)
1 off
Trim (Rhapsody, Calypso & Richmond models)
1 off
Cast trim (Caress Contemporary & Caress Traditional models)
1 off
Loose items bag, which includes (where applicable) :-
1 off
Remote control handset (RC models only)
1 off
Cable fixing kit (all models)
1 off
Length of foil tape (all models)
1 off
Installation & user instruction book (all models)
5 off
1.5V batteries (RC models only, 3 off for control valve, 2 off for handset)
1 off
1.5V battery (SC models only)
1 off
Guarantee card (all models)
1 off
L/H & R/H fret mounting brkts (Rhapsody, Calypso & Caress
Contemporary models only)
2.2

INSTALLING THE FIRE BOX

Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys of 3 metre minimum
effective flue height.
175mm (7 inch) diameter lined brick or stone flue, insulated pre-fabricated
metal flue box to BS 715 / BS EN 1856-2 of 3 metre minimum effective flue
height.
When installing into 125mm (5 inch) diameter lined brick or stone flue, or
insulated pre-fabricated metal flue box to BS 715 / BS EN 1856-2. the
restrictor baffle must not be fitted.
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.
SECTION 2

INSTALLATION OF FIRE

10

Advertisement

Table of Contents
loading

This manual is also suitable for:

RichmondCaress contemporaryRhapsodyCalypso

Table of Contents