Matrix U7xi Owner's Manual page 35

Cycles
Hide thumbs Also See for U7xi:
Table of Contents

Advertisement

ASSEMBLY STEP 4
AC2
Z12
Q08
Z11
Z13 Z34
WHITE HARDWARE BAG :
BUTTON HEAD BOLT
Z11
(M8x25L)
Z12
SPRING WASHER
BUTTON HEAD BOLT
Z13
(M5x10L)
Open WHITE AND BLUE HARDWARE BAGS.
A
Attach MANUAL INCLINE LIFT LEVER to
B
GUIDE RAIL SET using 4 BOLTS (D), 4 FLAT
WASHERS (E), 4 SPRING WASHERS (F) and 4
NUTS (G).
Align GUIDE RAIL SET with MAIN FRAME as
C
shown.
Lift up on the MANUAL INCLINE LIFT LEVER
D
and place it in one of the holes inside the MAIN
FRAME.
Attach the GUIDE RAIL SET to the MAIN
E
FRAME using 4 BOLTS (G), 4 FLAT WASHERS
(H), 4 SPRING WASHERS (I) and 4 NUTS (J).
BLUE HARDWARE BAG :
4
Z34
BUTTON HEAD BOLT
(M8x25L)
4
2
2
35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

U7xeU5xR7xeR5xR3xH7xi ... Show all

Table of Contents