Matrix U7xi Owner's Manual page 33

Cycles
Hide thumbs Also See for U7xi:
Table of Contents

Advertisement

ASSEMBLY STEP 2
Z31
Z32
Z33
Open YELLOW HARDWARE BAG.
A
Z31
Attach MANUAL INCLINE LIFT LEVER to
B
Z33
GUIDE RAIL SET using 4 BOLTS (D), 4 FLAT
Z32
WASHERS (E), 4 SPRING WASHERS (F) and 4
NUTS (G).
Align GUIDE RAIL SET with MAIN FRAME as
C
shown.
Lift up on the MANUAL INCLINE LIFT LEVER
D
and place it in one of the holes inside the MAIN
FRAME.
Attach the GUIDE RAIL SET to the MAIN
E
FRAME using 4 BOLTS (G), 4 FLAT WASHERS
(H), 4 SPRING WASHERS (I) and 4 NUTS (J).
YELLOW HARDWARE BAG CONTENTS
BUTTON HEAD BOLT(M8x15L)
FLAT WASHER
SPRING WASHER
4
4
4
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

U7xeU5xR7xeR5xR3xH7xi ... Show all

Table of Contents