Supply Gas Installation - Valor 1200EAN (NG) Installation And Owner's Manual

Direct vent zc fireplace
Table of Contents

Advertisement

QUALIFIED
INSTALLER
Window Removal
The window is held in place by a spring-loaded lever on
each side.
1. To remove the window, locate the levers on each
side of the window towards the top. Using your
fi nger, pull the lever towards you and unhook it from
the window frame bracket.
2. Gently pull the top of the window outward.
3. Lift the window out of its bottom railing and set it
aside in a safe place to avoid damage.
Section Views
The gas supply inlet connection is a 3/8 inch NPT male
connector and is located on the left hand side of the
fi rebox.
Use only new black iron or steel pipes or copper tubing
if acceptable—check local codes. Note that in USA,
36
Appliance Preparation

Supply Gas Installation

X
copper tubing must be internally tinned for protection
against sulfur compounds.
Unions in gas lines should be of ground joint type.
The gas supply line must be sized and installed to
provide a supply of gas suffi cient to meet the maximum
demand of the appliance without undue loss of pressure.
Sealant used must be resistant to the action of all gas
constituents including LP gas. Sealant should be applied
lightly to male threads to ensure excess sealant does not
enter gas lines.
Window frame
Bottom railing

Advertisement

Table of Contents
loading

This manual is also suitable for:

1200eap (lpg)

Table of Contents