Installing The Belt Drive - Yamaha XC50V Service Manual

Hide thumbs Also See for XC50V:
Table of Contents

Advertisement

4
3
1
1
1
3
BELT DRIVE
5. Install:
8 secondary sheave 1
8 spring
2
8 clutch carrier 2
NOTE:
5
Attach the clutch spring holder 3 and clutch
spring holder arm 4 onto the secondary sheave
as shown. Then, compress the spring, and
tighten the clutch carrier nut 5.
Clutch spring holder
EAS00325

INSTALLING THE BELT DRIVE

2
1. Install:
8 V-belt 1
8 clutch assembly 2
cC
Do not allow grease to contact the V-belt,
secondary sheave assembly.
NOTE:
Install the V-belt onto the primary sheave side.
2. Install:
8 clutch carrier nut 1
55 Nm (5.5 m • kg, 39.8 ft • lb)
NOTE:
While holding the clutch carrier with the rotor
2
holding tool 2, tighten the clutch carrier nut with
the locknut wrench 3.
Rotor holding tool
Locknut wrench
5-44
ENG
90890-01337 (YM-33285)
( YM-33285-6)
90890-01235
90890-01348 (YM-01348)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents