Planning The Installation; Unpacking And Handling - DCS RGS-305 Installation Manual

Rgs series range
Hide thumbs Also See for RGS-305:
Table of Contents

Advertisement

PLANNING THE INSTALLATION

RECOMMENDED INSTALLATION INSTRUCTION
Install components in the following order:
A) Vent Hood
B) Backguard System
C) Range
1) Locate and level range according to range installation instructions.
2) Measure distance from floor to top of island trim on range adding 1/8" for backguard clearance.
3) Transfer this measurement to the wall. This will mark the bottom of your backguard.
4) From this line measure 28" up wall to mark top of 30" backguard. This is the minimum height
that the bottom of your vent hood can be installed.
6) Follow vent hood manufacturer's installation instructions to install vent hood.
7) Follow backguard installation instructions to install backguard.
8) Connect gas and electric connections and slide range into position.

UNPACKING AND HANDLING

STEP 1:
MOVING AND PLACING THE RANGE
The ranges have shipping weights varying from
380lbs. to 600lbs. After removal of packing material,
it is recommended that the door(s), grates, front kick
panel, and drip pan (below knobs) be removed to
facilitate handling. This will reduce the weight for
ease of handling.
Fig. 1
5
Kick Panel

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents