Chapter 2: Installation; Unpack The Vtrak J300S - Promise Technology VTRAK J300S Product Manual

Hide thumbs Also See for VTRAK J300S:
Table of Contents

Advertisement

Chapter 2: Installation

Unpack the VTrak J300s (below).
Mount J300s Unit in a Rack (page 9)
Install Disk Drives (page 11)
Set Up Data Cable Connections (page 15)
Set Up Serial Cable Connections (page 19)
Connect the Power (page 20)
Setup CLI Connection (page 21)

Unpack the VTrak J300s

The VTrak J300s box contains the following items:
VTrak J300s Unit
Quick Start Guide
Null Modem Cable (1)
1.0m (3.3 ft) SAS cable (1)
Figure 1. VTrak J300s Front View (bezel removed)
The electronic components within the J300s unit is sensitive to
damage from Electro-Static Discharge (ESD). Observe
appropriate precautions at all times when handling the J300s unit
or its subassemblies.
Disk Drive Carriers
Screws for disk drives
(52 including 4 spares)
1.5m (4.9 ft) Power cords (2)
CD with Product Manual and Quick
Start Guide
Warning
LED Panel
7

Advertisement

Table of Contents
loading

Table of Contents