Wiring - Danfoss 102E7 Installation And User Manual

7-day electronic mini-programmer for controlling hot water and heating
Hide thumbs Also See for 102E7:
Table of Contents

Advertisement

10. Then press the SELECT button until the bar lines up with
the word OFF and check the system does not operate.
11. Set the rocker switch to WATER ONLY. Press the SELECT
button until the bar in the display lines up with the word
ON and check that the water circuit only operates.
12. When the circuit check has been completed, replace the
wiring cover and tighten the fi xing screw. Cut any cable
aperture in the wiring cover which may be necessary to
accommodate surface mounted cables.
13. Finally set time of day and programmes required, noting
that the unit is supplied with a pre-set programme, as
stated on Page 14.

Wiring

6

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 102E7 and is the answer not in the manual?

Questions and answers

Table of Contents