Installation - Isuzu C22NE Workshop Manual

Isuzu gasoline engine c22ne, 22le, 20le
Table of Contents

Advertisement

6B-8 ENGINE COOLING
• Play or abnormal noise in the bearing
• Cracks or corrosion in the impeller

Installation

1. Before installing water pump, coat sealing surface with
silicon grease.
2. Install water pump assembly and tighten bolts to the
specified torque.
Torque: 25 N⋅m (2.5 kgf.m)
3. Timing belt
• Install timing belt, refer to timing belt installation step in
"Timing Belt" in this manual.
4. Connect radiator hose and replenish EC.
5. Connect battery ground cable.

Advertisement

Table of Contents
loading

This manual is also suitable for:

22le20le

Table of Contents