Installation Checklist - Nimbus Water Systems WaterMaker Five WM5-50 User Manual

5-stage reverse osmosis system
Hide thumbs Also See for WaterMaker Five WM5-50:
Table of Contents

Advertisement

Installation Checklist

1. System is located where it will not be subject to physical impacts or rough contact by heavy objects.
2. Feed water pressure to the unit is no less than 40 psi and no greater than 80 PSI.
3. Ensure the plastic retainer clip that holds the desalinator cartridge in place is fully engaged and locked in place. The slide
locks must snap into place in the slots. If the clip does not snap easily into place through the slots it means the cartridge is not
fully inserted into the connectors. Press top or bottom of cartridge to engage connectors until it snaps into place properly.
4. All tubing connections, especially push-in quick connections, are fully inserted.
5. Tubing connected between the faucet and the drain saddle fitting (the fitting attached to the sink drain pipe) runs "down-
hill" to the drain. There should be no loops or places where water would not flow out to the drain.
6. Angle stop valve is open. The small shut-off valve on the feed valve assembly is open.
7. Within one to two hours after initial application of water pressure, check again for leaks especially at the tank, faucet tub-
ing and connectors. These parts will not see full pressure until approximately 2 hours after the system is activated.
8. Flush three tankfuls of product water to drain. If a chlorine scent persists, repeat flushing procedure.
42445 Avenida Alvarado, Temecula, CA 92590
12
(800) 451-9343 · www.nimbuswater.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents