Installation Checklist - Nimbus Water Systems WaterMaker Five WM5-50 Instruction

5-stage reverse osmosis system
Hide thumbs Also See for WaterMaker Five WM5-50:
Table of Contents

Advertisement

Installati on Checklist
1. System is located where it will not be subject to physical impacts or rough contact by heavy objects.
2. Feed water pressure to the unit is no less than 40 psi and no greater than 80 PSI.
3. Ensure the plasti c retainer clip that holds the desalinator cartridge in place is fully engaged and locked in place. The slide
locks must snap into place in the slots. If the clip does not snap easily into place through the slots it means the cartridge is not
fully inserted into the connectors. Press top or bott om of cartridge to engage connectors unti l it snaps into place properly.
4. All tubing connecti ons, especially push-in quick connecti ons, are fully inserted.
5. Tubing connected between the faucet and the drain saddle fi tti ng (the fi tti ng att ached to the sink drain pipe) runs "down-
hill" to the drain. There should be no loops or places where water would not fl ow out to the drain.
6. Feed water valve is open.
7. Within one to two hours aft er initi al applicati on of water pressure, check again for leaks especially at the tank, faucet tub-
ing and connectors. These parts will not see full pressure unti l approximately 2 hours aft er the system is acti vated.
8. Flush three tankfuls of product water to drain. If a chlorine scent persists, repeat fl ushing procedure.
41840-A McAlby Court, Murrieta, CA 92562
12
(800) 451-9343 · www.nimbuswater.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents