Installation Checklist - Nimbus Water Systems CS-2 User Manual

Reverse osmosis system
Hide thumbs Also See for CS-2:
Table of Contents

Advertisement

CS-2 Installati on Checklist
1. System is located where it will not be subject to physical impacts or rough contact by heavy objects.
2. Feed water pressure to the unit is no less than 40 psi and no greater than 80 PSI.
3. All tubing connecti ons, especially push-in quick connecti ons, are fully inserted.
4. Tubing connected between the faucet and the drain saddle fi tti ng (the fi tti ng att ached to the sink drain pipe) runs
"downhill" to the drain. There should be no loops or places where water would not fl ow out to the drain.
5. Feed water valve is open.
6. Within one to two hours aft er initi al applicati on of water pressure, check again for leaks especially at the tank, faucet
tubing and connectors. These parts will not see full pressure unti l approximately 2 hours aft er the system is acti vated.
7. Flush three tankfuls of product water to drain. If a chlorine scent persists, repeat fl ushing procedure.
41840-A McAlby Court, Murrieta, CA 92562
10
(800) 451-9343, www.nimbuswater.com

Advertisement

Table of Contents
loading

Table of Contents