Enerzone Solution 1.6 AGENCY PHASE II CERTIFIED WOOD Installation And Operation Manual page 43

Certified wood stove
Hide thumbs Also See for Solution 1.6 AGENCY PHASE II CERTIFIED WOOD:
Table of Contents

Advertisement

Solution 1.6 Installation and Operation Manual
6- Gently flip the stove back
on its pedestal making
sure not to put too much
weight on the rear edge of
the base.
7- Open the ash drawer (h)
lid then slide it into the
front
opening
pedestal.
8- Position the stove for its
installation
and
the bricks, ash plug and
loading
door
Appendix 9: Exploded
Diagram and Parts List
for bricks layout).
Note: Make sure that baffle
components have not moved
during
the
leg
installation
process since a flue blockage
may occur.
of
the
reinstall
(see
43

Advertisement

Table of Contents
loading

Table of Contents