Sequence Of Operation - NTI Matrix M100 Installation And Operating Instructions Manual

Matrix series
Table of Contents

Advertisement

Matrix Installation and Operation Instructions

14.0 SEQUENCE OF OPERATION

Figure 14.1 Matrix Boiler Control Sequence Of Operation
120v Power
Applied
Closed
Error
A S C
VDC Signal
to Combustion
Blower
Error
A S O
Sentry 2100
modulates combustion
blower based upon setpoint
and programing
Call for flame ends
Displays version
b1.0
Furnace Control
closes T-C circuit.
Forced Air Demand
N/O
Open
Open
Closed
Power to Ignitor
120V to S1
Igniter warm-up
5 seconds
Power to Gas Valve
Boiler in
standby mode
Furnace Control
Awaiting Input
closes A-C circuit.
From Furnace Control
at Contacts A-C-T
Furnace Control closes
A-C and T-C circuit.
Hydronic Demand
Energizes Internal
Circulator (C1)
Sentry 2100
Sentry 2100
Sentry 2100
Combustion Blower
Starts, SFS (80)
Prepurge
Checks Flame
Probe Signal
Greater than 1.0 uAmp
50
DHW Demand
`
Sentry 2100
24 V
Water Temperature Limit
&
Flue Gas Temperature Limit
&
Water Pressure Limit
Check
24 V
Three
Retries
for Flame
Less than
0.6 uAmp

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Matrix M100 and is the answer not in the manual?

This manual is also suitable for:

Matrix m100v

Table of Contents