STEP 2 Installing Location Requirements Install the boiler in an area that allows for service and maintenance access to utility connections, hydronic and gas piping, intake and exhaust piping, lters, and traps. Ensure the following clearances are maintained when choosing an installation location.
Page 4
POUR INSTALLATION AVEC ÉVACUATION DIRECTE OU AVEC as e. AIR COMBURANT (Categorie IV) ns um e co el be NTI Boilers Inc. 30 Stonegate Dr., Saint John, NB, E2H 0A4, Canada thi s ov al required, the conversion kit supplied Model Fuel Input, MBH [Entrée, kW]...
STEP 2 Installing Preparing for Exhaust Vent and Intake Air Piping Clean and dry the boiler connection. DO NOT use primer or cement on the boiler connection. When preparing pipe for installation: Ensure cuts are square. Bevel cut edges by 1/16” - 1/8”. Deburr the pipe.
Page 6
STEP 2 Installing Vent Termination Options Concentric Vent Roof Vent Termination Maintain 12” min. clearance above grade or snow level Combustion Air Combustion Air Vent Concentric Vent Sidewall Termination Combustion Air Combustion Air Vent Vent 1 in min. (a) Maintain 12” min. clearance above grade or snow level 420019002700 - Rev.
Page 7
STEP 2 Installing Two-pipe Sidewall Termination 4 in min. Exhaust Intake Gas Vent Directly Below Keep Free of Obstructions Interior View Exterior View Two-pipe Roof Termination 4 in min. Exhaust Exhaust Intake Intake * Maintain 12” min. clearance from any obstruction and above highest anticipated snow...
Page 8
STEP 2 Installing Intake Air and Exhaust Vent Materials CAUTION This boiler is certified as a “Category IV” appliance and requires a special venting system. The vent system will operate with a positive pressure in the pipe. Exhaust gases must be piped directly outdoors using the vent materials and rules outlined in the installation manual.
NTI o ers indirect water heaters in a wide range of gallon sizes in stainless steel construction. The water connections must be installed in accordance with all local and National plumbing codes, or any applicable standard which prevails.
STEP 2 Installing CH PRESSURE RELIEF VALVE This boiler is provided with a CH pressure Pressure relief valve that complies with the ANSI/ Relief Valve ASME Boiler and Pressure Vessel Code, Section IV (Heating Boilers). The included 30 psi CH Pressure Relief Valve must be installed at the top of the boiler, using the included pipe adapter and grommet, as illustrated.
STEP 2 Installing Connecting the Condensate Drain This boiler is shipped from the factory with a pre-installed CAUTION condensate trap and a separate drain hose. The supplied drain hose must be connected before routing the Do not use metal pipe for draining condensate. condensate to one of the following disposal options: a.
STEP 2 Installing Gas Connection It is recommended that this boiler be connected as the rst appliance *WARNING: If the boiler is connected to Liquefied downstream of the gas meter to ensure a su cient gas supply. Propane Gas (LP) it MUST be converted using the LP Conversion Kit included with the boiler.
Page 13
STEP 2 Installing Wiring *WARNING: Install wiring and electrically ground boiler in accordance with the authority having jurisdiction or, in the absence of such an authority, follow the National Electrical Code, NFPA 70, and/or CSA C22.1 Electrical Code- Part 1 in Canada. Failure to follow all applicable local, State, and National regulations, mandates, and building supply codes could result in property damage, serious personal injury, or death.
Page 14
STEP 2 Installing 1. Connecting Power for DHW & CH Pumps (120V) and Zone Outputs (dry contact) To connect power for the CH and DHW external pumps and zone loads (pumps or valves) at the boiler junction box: Shut o the power supply at the boiler and at the circuit breaker. Shut o the gas at the manual shuto .