Cino eC Pro Installation And Maintenance Manual page 51

Table of Contents

Advertisement

cino eC PRO by
13.15. regulate the speed
of mixers
13.16. choose the
quantity of break
numbers
13.17. determine the
suction fan time
13.18. time tests
13.19. access to the rear
13.20. remove water
13.21. install a payment
system
13.22. return some
material under guarantee
MAN1010119 rel. 01 dated 30.01.2014
www.rheavendors.com
the rotation speed of the motors of product mixers can be adjusted
between 15,000 r.p.m. and 5,000 r.p.m.; the drink quality of
instant products depends a lot upon the action of the fans of
mixers: instant chocolate generally requires a long mixing time at
the maximum speed for dissolution in water whereas instant tea
shall not be mixed to get a drink quality without any bubble on the
surface;
if instant products can be hardly dissolved in water, it may be of
use to stop the product dispensing cycle from the product canister
for a short time; the water flowing into the mixing bowl will have
the time necessary to remove any product build-up;
to remove the residual powder of instant products from inside the
machine, it is recommended to use the value in minutes you have
already programmed (three); if you should use particularly volatile
products, increase the time to five (and more) minutes;
to check the rotation time of a product motor and a mixer fan or
the activation time of a solenoid valve during the programming
phase, when the display shows "PRODUCT N" or "WATER N time"
or "MIXER N", press the "PROG" key: the device will be activated
for the programmed time;
make sure that the power supply cable has been detached
from the mains before
unscrew the six screws intended to fasten the metal panel (
lift slightly and extract the panel;
all internal components of the machine can be now accessed;
prepare a bucket beneath the support surface of the machine; after
having removed the back of the machine, remove the plug closing
the drain tube of the air break by unscrewing the screw (
access the drain tap of the boiler by unscrewing the two screws
(
) and open it; activate the "deinstallation" cycle (see 09.01.f.);
there is a kit including all the parts necessary to install a payment
system in cino eC PRO; after having installed the components of
this kit, refer to the above to programme the system functionality;
Rheavendors Services S.p.A. is at disposal for any kind of support
and information on the installation of payment systems; (see
02.02.);
if you should return any material under guarantee that is either
defective or not in compliance with your requirements, fill in the
form
"MOD.
PO
19.01/2B
Authorisation to return" and send it to the fax number above to
apply for authorisation; only after having received the authorisation
form signed and numbered, you are permitted to send the goods at
your expenses to the address specified by the form;
tel: 0039 02 966 551
rheavendors group's sole property
attention
Materials
under
guarantee
fax: 0039 02 96 55 086
e mail: rheavendors@rheavendors.com
see 09.01.a.
see 09.01.a.
see 09.01.f.
see 09.01.a.
);
),
page no. 51 of 52 page

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents